Home · Energy projects · Bucșani Power-to-X
Bucșani Power-to-X
Solar and wind power turned into RFNBO green hydrogen and eSAF, with a gas pipeline and a railway on the doorstep.
Concept / early developmentElectrolyser
50 MW (up to 60)
Green H₂
~3,600 t / year
eSAF
~8,000 t / year
Power
~250 GWh / year
Project stage
- Concept
- Development
- Ready to build
- Construction
- Operation
Opportunity
We are looking for partners
Wind PPA
≥ 50 MW onshore wind in Romania, 10 years, from 2028–2029 — pay-as-produced or fixed profile.
Send an offer →CO₂ supply
25–30 kt/year (70–82 t/day), 10 years, within ~150 km. Biogenic CO₂ preferred; industrial CO₂ also considered.
Send an offer →Highlights
At a glance
- Option 1: green hydrogen injected into the pipeline ~0.5 km from the site
- Option 2: eSAF from green H₂ + captured CO₂ (RWGS + Fischer-Tropsch), shipped by rail
- Powered by ~120 MWp solar on our land plus a 50 MW wind PPA
- RFNBO-compliant under EU Delegated Acts 2023/1184 and 2023/1185
- Targeting the H2Global tenders (10-year offtake)
- Promoted with H2B2 Electrolysis Technologies

Key data
LocationBucșani, Giurgiu County
Electrolyser50 MW base case, up to 60 MW
H₂ output~3,500–3,800 t/year
eSAF output~8,000–9,000 t/year
CO₂ need25,000–30,000 t/year
Power~120 MWp solar + 50 MW wind
LogisticsPipeline ~0.5 km · rail station nearby
StatusConcept / early development